波音游戏源码-波音博彩公司评级_百家乐园天将_新全讯网3344111.c(中国)·官方网站

Water-cooled Air-conditioning


Water-cooled Air-conditioning


Description
A more energy efficient water-cooled chiller plant of total 1500 refrigeration tons was installed to replace existing air-cooled chillers in the central air-conditioning plant serving Sports Centre and Bank of China (Hong Kong) Complex. Evaporative cooling towers are used as the means for heat rejection in the system.
 
Location
Roof of Yellow Zone, Yeung Kin Man Academic Building
 
Notes
Due to safety reasons, site visit can be arranged by advance booking.
 
Enquiry
Mr. P K Chan (CDO)
Tel: 3442 6908
Email : fmpk@cityu.edu.hk
 
More Information
Water-cooled chillers of total capacity of 3000 Rtons have been installed for the central air-conditioning plant (total capacity of 7000 Rtons). Compared with the air-cooled chillers, use of water-cooled chillers can realize saving in energy consumption of 22% in year 2010, which equates to reduction of carbon emission by planting of 22,246 no. of trees.
 
Virtual Help Desk X
百家乐官网趋势图怎么看| 大发888网页版游戏| 网络百家乐官网破| 死海太阳城酒店| 玩百家乐官网澳门皇宫娱乐城| 百家乐足球投注网哪个平台网址测速最好 | 百家乐官网投注方法网| 免费百家乐过滤软件| 易球百家乐官网娱乐城| 大发888中文官网| 励骏会百家乐官网的玩法技巧和规则 | 黄金百家乐官网的玩法技巧和规则| 新加坡百家乐规则| 百家乐官网娱乐网真钱游戏| 一起pk棋牌游戏| 百家乐是骗人吗| 百家乐官网注码技巧| 威尼斯人娱乐网官网| 云鼎百家乐注册| 百家乐官网去澳门| 盛世娱乐| 大中华百家乐的玩法技巧和规则| 百家乐官网投注法| 新2娱乐城| 大发888怎么下载| 百家乐平台哪个好本站所有数据都是网友推荐及提供 | 赌博堕天录漫画| 最佳场百家乐的玩法技巧和规则 | 合作市| 大发888娱乐场下载注册| 百家乐洗码| 百家乐官网23珠路打法| 百家乐官网视频金币| 百家乐官网AG| 孟州市| 555棋牌游戏| 永利高平台网址| 银泰百家乐官网龙虎斗| 凤凰县| 连南| 六合彩挂牌|