波音游戏源码-波音博彩公司评级_百家乐园天将_新全讯网3344111.c(中国)·官方网站

Network Upgrade: Campus Network Gets a Boost

by C Y Kwok

Staff members and students may or may not be aware that the University’s data network is currently undergoing a major upgrade process. The upgrade consists of two phases. The first phase was actually started early this year and it has almost come to completion.  The second phase will take place near the end of this year and expected to finish by mid 2008.

In general, a data network necessitates a major upgrade every four to six years, not only because an aging data network will be costly (in terms of money and labour) to maintain and may become problematic over time, but also because a data network needs to adapt to advancements in networking technologies and standards as well as to provide sufficient capacity to meet the changing user demands.

The previous network upgrade was conducted between 2001 and 2003, during which all the ATM switches and core routers were replaced with Gigabit Ethernet switches. The upgrade was proved to be a very successful one, for the new network was IP multicast enabled and able to transport converged IP traffic carrying data, video and voice concurrently over the same network media with guaranteed quality level for some selected services.  It had also shown high performance, availability and reliability. Nevertheless, another network upgrade is still inevitable after all these years due to shortened product lifecycles of the networking devices.

The current network upgrade project was initiated in 2006, based on the view that the majority of the networking devices in use would become obsolete by the end of 2007. Furthermore, the existing networking devices could not support 10G Ethernet (which becomes more affordable and is the mainstream technology deployed at the core of a data network nowadays) without a forklift upgrade. Since upgrading an existing network was a non-trivial task, it was decided to divide the upgrade in two phases. Phase I was to upgrade all the core switches with 10G interconnections as well as the network switches in a few large wiring closets with 10G uplinks. Phase II is to upgrade the network switches in the other wiring closets such that each switch port will be able to support a 10/100/1000 Mbps connection for the end users. A simplified network diagram showing the new network is shown as follows:

 

networkChart

The upgrade will put the University’s data network in par with those of the leading universities in the world and users will not have to worry about running out of network bandwidth in the next few years. The new network will offer many new features, such as enhanced QoS (Quality of Service), Flex Link, Scavenger Traffic Control, Native IPv6 support in hardware, Network Virtualization, etc.  Staff members and students will benefit from these new features and enjoy the increased scalability, availability and performance of the network.

网上玩百家乐官网有钱| 真人娱乐城开户送钱| 亚洲百家乐新全讯网| 大发888真钱娱乐游戏博彩| 百家乐官网技巧介绍| 百家乐官网娱乐城足球盘网| 百家乐押注最高是多少| 金沙百家乐官网娱乐城场| 泰山百家乐的玩法技巧和规则| 百家乐官网现金网平台排名| 时时博百家乐的玩法技巧和规则| 百家乐官网群sun811.com| 大发888游戏攻略| 百家乐娱乐城彩金| 新巴尔虎右旗| 水果机技术打法| 百家乐庄闲比率| 778棋牌游戏| 百家乐桌| 百家乐官网牌路图表下| E世博| 百家乐赌场现金网平台排名| 百家乐官网路单显示程序| 千亿娱乐城注册| 博9网娱乐| 安卓水果机游戏下载| 代理百家乐官网试玩| 战神娱乐城| 乐宝百家乐的玩法技巧和规则| 康莱德百家乐官网的玩法技巧和规则| 克拉玛依市| 百家乐官网策略大全| 波克棋牌游戏大厅| 百家乐里面的奥妙| 百家乐官网游戏介绍与分析| 哪里有百家乐官网代理| 真人百家乐视频| 立博百家乐官网的玩法技巧和规则| 百家乐官网什么平台好| 百家乐那里玩| 百家乐棋牌游戏皇冠网|